Company's field of activityCompany's field of activity in specialized categories
New contentLatest posts...
The most visitedPopular content here
Design and construction of Oil Recovery Vessel

دسامبر 15, 2024 - Oil Recovery vessel

Design and construction of Oil Recovery Vessel

Design and construction of Oil Recovery Vessel The Oil Recovery, which is abbreviated as ORV, is a specialized vessel for

Pre-design and pre-engineering of Qeshm Oil Terminal Project

دسامبر 11, 2024 - Offshore

Pre-design and pre-engineering of Qeshm Oil Terminal Project

Pre-design and pre-engineering of Qeshm Oil Terminal Project Pre-engineering of the marine sector in the oil industry, especially in the

Building of oil Carrier vessel 31.000 ton

دسامبر 10, 2024 - Oil Carrier vessel

Building of oil Carrier vessel 31.000 ton

Construction of two 31,000-ton oil carrier vessels In August 2020, the Iraqi Oil Tanker Company reached an agreement with the

Qeshm oil terminal project contract signing meetings

دسامبر 10, 2024 - Offshore

Qeshm oil terminal project contract signing meetings

Qeshm oil terminal project contract signing meeting The Qeshm Oil Terminal Project contract signing meetings were held in the presence

Design, pre-engineering and engineering contract, setting up the sea section of Qeshm oil terminal

نوامبر 30, 2024 - Offshore

Design, pre-engineering and engineering contract, setting up the sea section of Qeshm oil terminal

The contract for the offshore part of the Qeshm oil terminals project The contract for design, pre-engineering and engineering, construction

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare

Copied to clipboard